Home Products Schedule Analyzer Upgrade Information

 
 
 
  Below is the entire update history of Schecule Analyzer for the Enterprise (SAe.) The current version is listed at the top. Registered, licensed Users are encouraged to look-up the version of their SAe software and reference the current updates here.
 
Key:
ALL: All SAe programs.
BASELINE: SAe Baseline Checker (released December 2003.)
DASHBOARD: SAe Dashboard (added May 2006.)
DESTEPS: File Transfer Steps Remover (added April 2005).
INVESTIGATE: SAe Investigator (added March 2007.)
LOGGER: SAe Schedule Logger (added July 2007.)
LOGIC: SAe Logic League (created 2003 and added to SAe January 2008.)
LONGPATH: SAe Longest Path Software (released December 2003.)
MASTER: Master Switch utility program (added May 2004.)
RELATED: SAe Related Schedules.
UPDATE: SAe Update Checker (released December 2003.)
WORKDAYS: Work Day Calculator (added August 2005.)

CURRENT VERSION:
Version 2.19 (July 2008)
OVERVIEW: ADDED MORE SUPPORT FOR LARGE NOTEBOOK LIBRARIES
UPDATE: Added more status reporting for Notebook checks.
UPDATE: Corrected NEW ACTUAL DATES WITH INCORRECT TIMES Report to properly account for milestone activities.
Version 2.18 (July 2008)
OVERVIEW: MINOR REPORT UPDATES AND BETTER ACTIVE REPORTS FUNCTIONALITY
ALL: Improved Active Reports response to P6 screen conditions.
BASELINE: Fixed the ACTIVITIES WITH TOO MUCH FLOAT Report.
UPDATE: Corrected float in CHANGE IN FLOAT GREATER THAN THE NUMBER OF DAYS IN THE UPDATE PERIOD Report.
Version 2.17 (July 2008)
OVERVIEW: FINAL CORRECTION FOR UPDATE CHECKER DEALING WITH NUMERIC ACTIVITY IDs
ALL: Added multiple database logon capability.
UPDATE: Final Numeric Activity ID adjustment. Version 2.16 is incorrect and should not be used.
UPDATE: Fixed a minor Calendar Report formatting error.
Version 2.16 (July 2008)
OVERVIEW: TEST PATCH FOR UPDATE CHECKER DEALING WITH NUMERIC ACTIVITY IDs
UPDATE: Attempt to correct for over-reporting in schedules with numeric Activity IDs.
Version 2.15 (July 2008)
OVERVIEW: ADDED NEW UPDATE CHECKER REPORT.
UPDATE: Added NEW ACTUAL DATES WITH INCORRECT TIMES Report.
DASHBOARD: Added NEW ACTUAL DATES WITH INCORRECT TIMES Report.
UPDATE: Updated Exclude Reports Section.
Version 2.14 (July 2008)
OVERVIEW: MINOR INTERNAL IMPROVEMENTS.
LOGIC: Changed SQL calls to comply with Oracle requirements.
UPDATE: Fixed Calendar Report.
Version 2.13 (June 2008)
OVERVIEW: ADDED SUMMARY OVERVIEW.
BASELINE: Added Summary overview section to teh report.
Version 2.12 (May 2008)
OVERVIEW:ERROR-PROOFED CPM CHECK.
BASELINE: Caught incorrect reporting of CPM settings if CPM in the schedule had never been computed.
UPDATE: Caught incorrect reporting of CPM settings if CPM in the schedule had never been computed.
Version 2.11 (May 2008)
OVERVIEW: SPEED-UP UPDATE CHECKER PROCESSING.
UPDATE: Dramatically spead-up relationship database building and prevented data server thrashing.
Version 2.10 (May 2008)
OVERVIEW: FIXED UNCOMMON ERROR IN UPDATE CHECKER.
UPDATE: Fixed endless loop opening report if project name is odd and report run more than once.
Version 2.09 (April 2008)
OVERVIEW: SELECT SCHEDULES FASTER BY LIMITING SCHEDULES SHOWN.
LONGPATH: Spead-up Pre-Slack preparation section.
ALL: Limit the number of schedules displayed by selecting their OBS.
Version 2.08 (April 2008)
OVERVIEW: ADJUSTED TWO UPDATE CHECKER REPORTS.
UPDATE: Fixed ACTIVITIES WITH MODIFIED DURATION TYPES Report.
UPDATE: Fixed ACTIVITIES WITH MODIFIED PERCENT COMPLETE TYPES Report.
Version 2.07 (March 2008)
OVERVIEW: IMPROVED ERROR ERROR CHECKING IN LONGEST PATH.
LONGPATH: Added the program to the run menu (previously loaded but not visable.)
LONGPATH: Fixed condition where Longest Path Sequence Number = 32000 (Completed activities without dates.)
UPDATE: Fixed Error 3001 in Comparing Issue Notes section.
Version 2.06 (March 2008)
OVERVIEW: ALLOWED BASELINE CHECKER TO DEAL WITH POORLY-MADE MEGA-SCHEDULES.
BASELINE: Added limit to stop checking (as opposes to just stop reporting.)
Version 2.05 (February 2008)
OVERVIEW: COMPLETION OF DISPLAYING PROJECTS SPEEDUP.
LOGIC: Greatly speed-up start of Open Project screen.
MASTER: Greatly speed-up start of Open Project screen.
INVESTIGATOR: Greatly speed-up start of Open Project screen.
LOGIC: Greatly speed-up re-painting of Open Project screen with baseline schedules.
MASTER: Greatly speed-up re-painting of Open Project screen.
INVESTIGATOR: Greatly speed-up re-painting of Open Project screen with baseline schedules.
DASHBORD: Allowed user to change screen font and size.
Version 2.04 (February 2008)
OVERVIEW: BEGINNING OF SIGNIFIANTLY FASTER AT DISPLAYING PROJECTS.
BASELINE: Greatly speed-up start of Open Project screen.
LOGGER: Greatly speed-up start of Open Project screen.
LONGPATH: Greatly speed-up start of Open Project screen.
RELATED: Greatly speed-up start of Open Project screen.
UPDATE: Greatly speed-up start of Open Project screen.
WORKDAYS: Greatly speed-up start of Open Project screen.
BASELINE: Greatly speed-up re-painting of Open Project screen with baseline schedules.
LOGGER: Greatly speed-up re-painting of Open Project screen with baseline schedules.
LONGPATH: Greatly speed-up re-painting of Open Project screen with baseline schedules.
RELATED: Greatly speed-up re-painting of Open Project screen with baseline schedules.
UPDATE: Greatly speed-up re-painting of Open Project screen with baseline schedules.
WORKDAYS: Greatly speed-up re-painting of Open Project screen with baseline schedules.
Version 2.03 (February 2008)
OVERVIEW: DUPLICATED P6 OPEN PROJECT SCREEN.
BASELINE: Improved look of Open Project screen with color-coded hierarchy.
LOGGER: Improved look of Open Project screen with color-coded hierarchy.
LONGPATH: Improved look of Open Project screen with color-coded hierarchy.
RELATED: Improved look of Open Project screen with color-coded hierarchy.
UPDATE: Improved look of Open Project screen with color-coded hierarchy.
WORKDAYS: Improved look of Open Project screen with color-coded hierarchy.
Version 2.02 (February 2008)
OVERVIEW: IMPROVED RELATED SCHEDULES PROGRAM.
DASHBOARD: More error-proofing on file open.
RELATED: Added Relationships and Lags to report.
RELATION: Prevented Run Time Error 3265.
BASELINE: Numerous spelling corrections.
UPDATE: Numerous spelling corrections.
Version 2.01 (January 2008)
OVERVIEW: MINOR CHANGES.
ALL: Prevented ORA-00911 error for Oracle installations.
LOGIC: Fixed video presentation.
ALL: More error protection from Internal Error 75 on login.
Version 2.00 (January 2008)
OVERVIEW: MOVED LOGIC LEAGUE TO THE SAe PACKAGE.
LOGIC: Added Logic League to Schedule Analyzer. Also made extensive user enhancements.
UPDATE: Added Average Float calculation.
UPDATE: Added ability to limit the number of lines in the ODD TOTAL FLOAT Report.
Version 1.62 (May 2007)
OVERVIEW: LAST VERSION 1 UPGRADE. FIXED TWO OPERATING ERRORS.
RELATED: Added relationship type and lag to report lines
Relation: Prevented Run Time Error 3265.
UPDATE: Prevented un-ending loop opening report with an unusual file name.
Version 1.61 (February 2007)
OVERVIEW: FIXED OPERATING ERRORS.
ALL: Fixed Oracle error number ORA-00911.
DASHBOARD: More error-proofing on file open.
ALL: Fixed program folder automatically opening on computer startup.
Version 1.60 (December 2007)
OVERVIEW: ADDED ISSUES AND ATTACHED DOCUMENTS SECTION FOR A TOTAL OF 13 NEW REPORTS.
BASELINE: Changed internal Memo collection to meet Oracle database restrictions.
UPDATE: Changed internal Memo collection to meet Oracle database restrictions.
BASELINE: Added EXPANDED REFERENCED DOCUMENT TYPE LAYOUT Report.
BASELINE: Added ATTACHED ACTIVITY DOCUMENTS Report.
BASELINE: Added: PROJECT DOCUMENT FILE Report.
DASHBOARD: Added ATTACHED ACTIVITY DOCUMENTS Report.
DASHBOARD: Added: PROJECT DOCUMENT FILE Report.
BASELINE: Improved COMPLETE PROJECT NOTES Report by removing HTML Tags
UPDATE: Added DELETED PROJECT DOCUMENTS Report.
UPDATE: Added ADDED PROJECT DOCUMENTS Report.
UPDATE: Added CHANGED PROJECT DOCUMENTS Report.
UPDATE: Added CHANGED PROJECT DOCUMENT LOCATION Report.
DASHBOARD: Added DELETED PROJECT DOCUMENTS Report.
DASHBOARD: Added ADDED PROJECT DOCUMENTS Report.
DASHBOARD: Added CHANGED PROJECT DOCUMENTS Report.
DASHBOARD: Added CHANGED PROJECT DOCUMENT LOCATION Report.
BASELINE: Added PROJECT ISSUES Report.
BASELINE: Added ACTIVITY ISSUES Report.
DASHBOARD: Added PROJECT ISSUES Report.
DASHBOARD: Added ACTIVITY ISSUES Report.
UPDATE: Added DELETED PROJECT ISSUES Report.
UPDATE: Added ADDED PROJECT ISSUES Report.
UPDATE: Added MODIFIED PROJECT ISSUE DATA Report.
UPDATE: Added MODIFIED PROJECT ISSUE NOTES Report.
DASHBOARD: Added DELETED PROJECT ISSUES Report.
DASHBOARD: Added ADDED PROJECT ISSUES Report.
DASHBOARD: Added MODIFIED PROJECT ISSUE DATA Report.
DASHBOARD: Added MODIFIED PROJECT ISSUE NOTES Report.
Version 1.59 (November 2007)
ALL: Fixed Line Edit: Cancel Button function while viewing reports.
ALL: Added View/ Copy Activity ID and Copy Full Activity description to menu.
ALL: Added Task Tag Help video.
ALL: Added Copy Activity Help video.
DASHBOARD: Improved INI Lower and Upper setting procedure.
DASHBOARD: Fixed ability to manually update Lower and Upper settings.
DASHBOARD: Added ACTIVITIES WITH REMAINING DURATION / % COMPLETE MISMATCHES Report.
DASHBOARD: Added the ACTIVITIES WITH NEW ACTUAL DATES THIS PERIOD Report.
DASHBOARD: Added the NEW PERCENT COMPLETE THIS PERIOD Report.
DASHBOARD: Added UDF Costs Reports.
DASHBOARD: Added UDF WBS Reports.
DASHBOARD: Added UDF ISSUES Reports.
DASHBOARD: Added UDF RISKS Reports.
DASHBOARD: Added UDF DOCUMENTS Reports.
LOGGER: Skip reports tagged to not contain Activity IDs (internal reliability enhancement.)
ALL: Don't run Active Reports routeen if report is not based on Activity ID.
Version 1.58 (November 2007)
BASELINE: Added Saved Calendar creation to baseline check as well as with update check.
BASELINE: Added Calendar Reports function.
RELATED: Fixed No Column 6 error.
Version 1.57 (October 2007)
UPDATE: Added User-Defined Field (UDF) Costs Reports.
UPDATE: Added UDF WBS Reports.
UPDATE: Added UDF ISSUES Reports.
UPDATE: Added UDF RISKS Reports.
UPDATE: Added UDF DOCUMENTS Reports.
Version 1.56 (October 2007)
ALL: Modified Active Reports to not automatically slide to the left-most column.
ALL: Improved View screen printing procedures.
UPDATE: Added Calendar Reports and Compare Calendars functions.
UPDATE: Changed date in Saved Calendar title from data date to the date that the file was saved.
Version 1.55 (September 2007)
UPDATE: Added the ACTIVITIES WITH NEW ACTUAL DATES THIS PERIOD Report.
UPDATE: Added the NEW PERCENT COMPLETE THIS PERIOD Report.
BASELINE: Cleaned-up formatting of hourly holidays.
BASELINE: Speed-up the FINISH-TO-START LAGS USED Report.
BASELINE: Speed-up the NON-OVERLAPPING LAGS USED Report.
BASELINE: Speed-up the ODD LAGS OR LEADS USED Report.
BASELINE: Speed-up the ACTIVITIES WITHOUT PREDECESSORS Report.
BASELINE: Speed-up the ACTIVITIES WITH PREDECESSORS BUT NO START RELATIONSHIPS Report.
BASELINE: Speed-up the ACTIVITIES WITHOUT SUCCESSORS Report.
BASELINE: Speed-up the ACTIVITIES WITHOUT A FINISH RELATIONSHIP Report.
BASELINE: Prevented hang in FRACTIONAL DAYS Report if database problems exist.
BASELINE: Prevented hang in ODD LAGS OR LEADS Report if database problems exist.
ALL: No longer automatically install MDAC on installation.
Version 1.54 (September 2007)
ALL: Speed improvements in displaying schedule listing.
ALL: Corrected default report directory.
ALL: Allowed manual review and adjustment of user directories.
Version 1.53 (August 2007)
ALL: Modified file locations to comply with Vista security requiremetns.
Version 1.52 (July 2007)
BASELINE: Greatly Speed-up execution of ACTIVITIES WITHOUT FINISH SUCCESSORS Report.
BASELINE: Added maximum line count to ACTIVITIES WITH PREDECESSORS BUT NO START RELATIONSHIPS Report.
ALL: Allowed for Database Administrator to prevent writing to the P5/P6 database.
BASELINE: Added Task Tags.
UPDATE: Added Task Tags.
Version 1.51 (July 2007)
LOGGER: Added Schedule Logger to the Schedule Analyzer suite.
ALL: Modified the default sever machine name and database to match new installs for P5.
ALL: Added Contractor to the list of login connections and removed the Version 3 Interbase option.
Version 1.50 (June 2007)
ALL: Changed over to use an external video player for Vista compatibility.
Version 1.49 (June 2007)
DATECALC: Added Ticker Tape, Save as Spreadsheet, and Print Functions.
DATECALC: Prevented Error 5 on loading Holidays.
BASELINE: Added Select Report function in View Report menu.
DASHBOARD: Added Select Report function in View Report menu.
UPDATE: Added Select Report function in View Report menu.
BASELINE: Redesigned and standardized View window with menus instead of buttons.
DASHBOARD: Redesigned and standardized View window with menus instead of buttons.
UPDATE: Redesigned and standardized View window with menus instead of buttons.
ALL: Improved saving video player settings.
Version 1.48 (June 2007)
ALL: Smart Copy now lists the title information in the second column and not the last.
ALL: Modified Smart Copy to put activity title in the second colum.
UPDATE: Improved User-Defined Field check accuracy.
ALL: Modernized Help/About in support of HTML help conversion.
ALL: Converted over to HTML Help to suport Vista installations.
MASTER: Added Help file.
BASELINE: Added maximum line limit to ACTIVITIES WITH TASK/DURATION TYPE MISMATCHES Report.
BASELINE: Corrected listing for "O-DUR" column in ACTIVITY ORIGINAL DURATIONS EQUAL TO ONE Report.
BASELINE: Added maximum line limit to TOPIC Check Reports.
BASELINE: Corrected misprint of activity ID in ACTIVITIES WITH TOO MUCH FLOAT Report.
BASELINE: Corrected misprint of predecessor activity ID in 'NON-HAMMOCK TYPE' LOE RELATIONSHIPS Report.
BASELINE: Corrected summary line in 'NON-HAMMOCK TYPE' LOE RELATIONSHIPS Report
UPDATE: Reformat calendar report to fit the page better.
UPDATE: Additional Activity ID formatting to improve accuracy in over-detection of changes.
UPDATE: Improved Calendar Changes accuracy.
UPDATE: Improved UDF Task Reports accuracy with unusual task/UDF combinations.
DASHBOARD: Improved reporting when reports sections were skipped.
DASHBOARD: Improved error handling on displaying extremely large reports.
Version 1.47 (May 2007)
BASELINE: Formatted numeric Activity IDs correctly in Critical Path Summary Review.
BASELINE: Added more status indications while in-progres.
Version 1.46 (April 2007)
LONGPATH: Computation routines speeded-up.
LONGPATH: Calendar limits better handled and reported on.
Version 1.45 (March 2007)
LONGPATH: Added check for lag calendar and CPM calculation rule settings.
LONGPATH: Re-wrote CPM computation section.
ALL: Allowed multiple video players to be used.
ALL: Upgraded installer corrects for Vista loading problems.
Version 1.44 (March 2007)
UPDATE: Corrected problems when comparing numeric activity IDs.
Version 1.43 (March 2007)
INVESTIGATOR: Added Investigator module to SAe.
UPDATE: Improved calendar reconition & pairing.
UPDATE: Improved User Defiened Field Check for Project Records.
UPDATE: Added Cost User Defined Field checks.
Version 1.42 (February 2007)
ALL: Listed WBS in alphabetical sub-order
LONGPATH: Fixed unusual program hang during "Computing CPM."
ALL: Ensured 'clean end' to all background processes.
Version 1.41 (February 2007)
ALL: Database Version awareness increased from Version 9 to 99.
ALL: Added Project Last Updated to project select screen.
WORKDAY: Added memory of previous Window size & location.
UPDATE: Fixed Percent Complete when Percent Complete Type is By Duration.
Version 1.40 (February 2007)
BASELINE: Added View print information help.
UPDATE: Added View print information help.
DASHBOARD: Added View print information help.
LONGPATH: Greatly Speed-up CPM/Slack/LPV calculation routines.
LONGPATH: Fixed time reported in Diagnostic Window.
Version 1.39 (January 2007)
BASELINE: Fixed error in relationship LOE check.
BASELINE: Fixed formatting problem in corrupt relationship check.
BASELINE: Fixed formatting problem in Baseline Schedules when activity id was very short.
UPDATE: Fixed formatting problem in Baseline Schedules when activity id was very short.
BASELINE: Fixed blank duplicate description report when too many exist to print all of them.
DASHBOARD: Made Video Help more prominent.
DASHBOARD: Added report name to title bar of program.
BASELINE: Improved Active Reports handling with P5.
UPDATE: Improved Active Reports handling with P5.
DASHBOARD: Improved Active Reports handling with P5.
Version 1.38 (November 2006)
UPDATE: Fixed reporting error with numeric Activity IDs.
BASELINE: Improved formatting of numeric Activity IDs.
BASELINE: Added ACTIVITIES WITH PREDECESSORS BUT NO START RELATIONSHIPS Report.
DASHBOARD: Added ACTIVITIES WITH PREDECESSORS BUT NO START RELATIONSHIPS Report.
BASELINE: Reversed Predecessor & Successors in some reports.
Version 1.37 (October 2006)
BASELINE: fixed ACTIVITIES WITH TOO MUCH FLOAT Report.
ALL: Cosmetic update of Version Label in View Screen.
UPDATE: Fixed Error 1001 on main screen.
UPDATE: Improved User Interface on Main Screen.
UPATE: Updated help video to explain new user interface.
Version 1.36 (October 2006)
BASELINE: Added ACTIVITIES WITH REMAINING DURATION / % COMPLETE MISMATCHES Report.
UPDATE: Added ACTIVITIES WITH REMAINING DURATION / % COMPLETE MISMATCHES Report.
BASELINE: Added ACTIVITIES WITH TOO MUCH FLOAT Report.
BASELINE: Fixed V 1.33 formatting errror when numeric IDs are used.
UPDATE: Fixed V 1.33 formatting errror when numeric IDs are used.
Version 1.35 (September 2006)
BASELINE: Added Immediate Report Help.
UPDATE: Added Immediate Report Help.
ALL: Added Copy Help video.
ALL: Added Report Help video.
ALL: Added Smart Copy to View menu.
Version 1.34 (September 2006)
ALL: Prevent exit (error) before schedules are done being displayed.
ALL: Allowed for early escape before all schedules are loaded.
Version 1.33 (August 2006)
UPDATE: Fixed PLANNED ACTIVITIES THAT HAVE BEEN DELETED SINCE LAST UPDATE report.
UPDATE: Fixed PLANNED ACTIVITIES THAT HAVE BEEN ADDED SINCE LAST UPDATE report.
UPDATE: Improved ADDED ACTIVITIES WITH FRACTIONAL DURATIONS report
UPDATE: Improved FRACTIONAL DURATION CHANGE report.
UPDATE: Improved Cancel from printing recovery.
UPDATE: Automatically resize reports for optimum amount of space.
BASELINE: Automatically resize reports for optimum amount of space.
BASELINE: Fixed formatting error in ACTIVITIES WITH TASK/DURATION MISMATCHES report.
BASELINE: Fixed ACTIVITY DISTRIBUTION HISTOGRAM report when unrealistically early project finish used.
BASELINE: Added scehdule designation to every activity in multi-schedule analyses.
UPDATE: Added scehdule designation to every activity in multi-schedule analyses.
Version 1.32 (July 2006)
BASELINE: More responsiveness added to Administrative Section.
MASTER: Modified program for Oracle compatability.
Version 1.31 (June 2006)
UPDATE: Allow multiple schedules to be analyzed at the same time.
UPDATE: Recorded new Help Video to explain new functioning.
UPDATE: Improved formatting of holidays with hours in the Calendar Section.
BASELINE: Improved formatting of holidays with hours in the Calendar Section.
UPDATE: Improved accuracy NEW ACTUAL DATES LATER THAN UPDATE DATE report.
UPDATE: Fixed Added/Deleted Task Resource Budgets reports.
UPDATE: Added Finsied Run Help message.
BASELINE: Added Finished Run Help message.
ALL: Through review and rewriting of all controls 'bubble help.'
ALL: New login help video.
BASELINE: New help video.
Version 1.30 (May 2006)
ALL: Fixed edit funtion in on-line reports.
ALL: Improved Tool-Tip Messages & Button Placement.
LONGPATH: Fixed Option Screen Help Button.
Version 1.29 (May 2006)
DASHBOARD: Added new program to Schedule Analyzer.
BASELINE: Added Dashboard access.
UPDATE: Added Dashboard access.
MASTER: Fixed Error 400 problem.
MASTER: Fixed Help File problem.
Version 1.28 (May 2006)
ALL: Versions 1.25 - 1.27 were flawed due to incorect Windows registration. Fixed.
Version 1.27 (March 2006)
BASELINE: Re-written for speed improvements.
BASELINE: Broke-out slow system checks from other administrative checks.
UPDATE: Improved processing speed when looking up expanded descriptions.
Version 1.26 (March 2006)
UPDATE: Better error recovery; resume working at next report.
UPDATE: Improved headers on printed reports.
BASELINE: Allow multiple schedules to be analyzed at the same time.
BASELINE: Improved headers on printed reports.
BASELINE: Administractive Preference check improvements.
BASELINE: Calendar check improvements.
Version 1.25 (March 2006)
ALL: Improved error handling with first-time User Logins.
ALL: Upgraded internal display controls to V5.
BASELINE: Fixed "CLICK ON ANY FILE IN THE DIRECTORY FOR USER FILES" repeating error.
LONGPATH: Prevent hang on close.
MASTER: Prevent hang on close.
UPDATE: Added ability to suppress any report in the series.
UPDATE: Fixed "CLICK ON ANY FILE IN THE DIRECTORY FOR USER FILES" repeating error.
UPDATE: Added Suspend/Resume Dates to the database.
UPDATE: Added 8 new Suspend/Resume date checks.
UPDATE: Fixed ACTIVE ACTIVITIES WITH NO PROGRESS Report.
UPDATE: Better error recovery; resume working at next report.
UPDATE: Improved headers on printed reports.
Version 1.24 (March 2006)
BASELINE: Made "ACTUAL FINISH IS BEFORE PROJECT START DATE" report more accurate.
BASELINE: Better recovery from canceled print.
BASELINE: Brought Personalize User Settings to main menu.
BASELINE: Improve identification of reports directory error recovery.
UPDATE: Improve identification of reports directory error recovery.
Version 1.23 (February 2006)
WORKDAY: Fixed workday to calendar bug.
WORKDAY: Added error checking.
BASELINE: Improved speed and completness of Database Integrety Checks
Version 1.22 (January 2006)
UPDATE: Eliminated Automation Error.
UPDATE: Eliminated Unable to load SQL Server OLEDB DLL error.
UPDATE: Improved processing speed on projects with deep hierarchies.
UPDATE: Fixed Units printout on ACTIVITY RESOURCE UNITS/TIMEPERIOD Report.
BASELINE: Eliminated Automation Error.
BASELINE: Eliminated Unable to load SQL Server OLEDB DLL error.
BASELINE: Improved processing speed on projects with deep hierarchies.
Version 1.21 (December 2005)
BASELINE: fixed printing error in NON-OVERLAPPING LAGS USED report.
BASELINE: Multiple status-reporting enhancements.
BASELINE: Multiple report formatting improvements.
BASELINE: Multiple speed improvements when database has bad data.
Version 1.20 (November 2005)
BASELINE: Cleaned-up Database Integrity Check when no errors are present.
BASELINE: Added Activity Duration Type summary.
UPDATE: DELETED & RE-ADDED ACTIVITY Report added.
Version 1.19 (October 2005)
UPDATE: Added INVALID ADDED RELATIONSHIP (DUE TO STATUS) Report.
Version 1.18 (August 2005)
WORKDAYS: Added Work Day Calculator to suite (future SAe Forensic Software)
DESTEPS: Added Transfer File Steps Remover program (DeSteps.)
Version 1.17 (August 2005)
UPDATE: Fixed "cannot find User Reports" error when schedule data dates are the same.
ALL: Fixed INI CONFIGURATION misfiling.
ALL: Internal separation of login configuration for future expansion.
BASELINE: Made Active Reports more accurate at guessing proper ID length.
UPDATE: Made Active Reports more accurate at guessing proper ID length.
ALL: Phrase "copied to clipboard" is only said once.
LONGPATH: Fixed Longest Path Initialization parameters problem.
Version 1.16 (July 2005)
UPDATE: Added Active Reports to jump straight to the schedule activity from the report.
BASELINE: Added Active Reports to jump straight to the schedule activity from the report.
Version 1.15 (June 2005)
UPDATE: Fixed hang in processing historical relationship lags section.
Version 1.14 (May 2005)
BASELINE: Added 6 CPM Settings checks plus cautions.
UPDATE: Added 7 CPM Settings checks plus cautions.
Version 1.13 (April 2005)
ALL: Bullet-proofed opening screen.
ALL: Removed SDK login and subsequent code to streamline and reduce the size of SAe
BASELINE: Added to Steps analysis.
LONGPATH: Fixed Cancel button.
Version 1.12 (March 2005)
ALL: Prevent hang-up on open of display of schedules to select
Version 1.11 (January 2005)
LONGPATH: Added more complete diagnostics.
LONGPATH: Removed semi-comma from SQL commands to prevent "Invalid Character" error with Oracle.
ALL: Updated to be compatible with P3e/c Version 5
Version 1.10 (December 2004)
UPDATE: Don't run CHANGE IN FLOAT GREATER THAN THE TIME IN THE UPDATE PERIOD Report if data date has not changed.
UPDATE: Don't run ACTIVIE ACTITIES WITHOUT PROGRESS Report if data date has not changed.
UPDATE: Added Longest Path flag to added relationships reports.
UPDATE: Added Longest Path flag to Modified Relationships reports.
ALL: Added System Administrator's manual to the distribution CD as a pdf file.
UPDATE: Don't perform Odd Float Check and Active Activities Without Progress if data date not changed.
UPDATE: Added Longest Path Flag to Added Relationship reports.
UPDATE: Added Longest Path Flag to Modified Relationship reports.
UPDATE: Added RELATIONSHIPS DELETED BEFORE TARGET DATE Report.
UPDATE: Added RELATIONSHIPS ADDED BEFORE TARGET DATA DATE Report.
UPDATE: Added MODIFIED RELATIONSHIP LAGS BEFORE THE TARGET DATA DATE Report.
UPDATE: Added various Warnings, Cautions, and Notes to Relationship Report Section.
Version 1.09 (November 2004)
UPDATE: Added cautions note to Active Activities without Status report.
LONGPATH: Improved error checking and reporting.
LONGPATH: Added automatic calendar extension if overrun.
Version 1.08 (October 2004)
UPDATE: Removed unneeded Changed WBS Check.
UPDATE: Improved Memo Check.
BASELINE: Improved Activity Code Check section.
BASELINE: Removed blank lines and added status tracking to Duplicate Descriptions Check.
Version 1.07 (September 2004)
LONGEST: Fixed problems with displaying answers.
BASELINE: Added Fractional Day Durations Report.
UPDATE: Added information notes to Fractional Duration checks.
ALL: Hide Login Settings if desired (and filled-in.)
ALL: Added Oracle OLE DB interface by Microsoft to login options.
Version 1.06 (August 2004)
BASELINE: Added option to skip integrity checks.
ALL: Perfected integration with MSSQL/MSDE or Oracle databases.
Version 1.05 (June 2004)
ALL: Converted over to INI-based parameter system for easier network installation.
ALL: Improved Database Connectivity and Configurability.
ALL: Show hidden "Save Login Settings" checkbox.
ALL: Install now automatically installs required Microsoft Data Access Components V2.6.
Version 1.04 (May 2004)
MASTER: Added Master Switch utility program to suite.
ALL: Added support for MSDN Database Server.
ALL: Improved Login Screen functionality.
Version 1.03 (December 2003)
ALL: Added 'save current screen font'.
ALL: Improved customization of window size and placement.
Version 1.02 (December 2003)
BASELINE: Added summary to Milestones coded as activities.
BASELINE: Fixed 'multiple rows in a singleton record' error.
ALL: Added P3e Version 4.0 compatibility.
ALL: Improved recovery on a single report error.
UPDATE: Added Modified WBS check.
Version 1.01 (December 2003)
UPDATE: Added As-Built float check
ALL: Final Beta Corrections: First Open Release
Version 1.00: Original Beta-Test, Released 31OCT03