PAPERS PUBLISHED BY RON WINTER, PSP
Visiting a Construction Site
Using CDROMS on a Constructon Project
Management of CPM Schedule Submission
RFIs and the Stubby Pencil
Adding Constrained Milestones
Baseline Schedule Analysis
presented at the Primavera 2002 User's Conference
Dealing with a Completion Schedule
White Paper on
Using Schedule Analyzer Professional
Schedule Update Analysis
presented at the Primavera 2003 User's Conference
Review of Feigenbaum text,
"Construction Scheduling with Primavera Project Planner"
published in the AACE Cost Engineering journal
How to Befuddle a College Professor (without Really Trying)
published in the AACE Cost Engineering journal
How to Manually Determine the As-Built Critical Path
presented at the AACE 2004 Annual Conference
Longest Path Value
presented at PMI College of Scheduling 2004 Annual Conference
Unpublished
Time Impact Analysis
paper by Ron Winter 2004
Managing Multiple Milestones
presented at the AACE 2005 Annual Conference
Extended Relationship Databases
presented at PMI College of Scheduling 2005 Annual Conference
Transparent CPM
presented at the AACE 2006 Annual Conference
The Proper Implementation of Resource Leveling
presented at the PMI College of Scheduling 2007 Annual Conference
Unpublished
Using SA Forensic
white paper by Ron Winter Consulting LLC 2007
Understanding P6 Dates
presented at the AACE 2009 Annual Conference
A book review of
"Faster Construction Projects with CPM Scheduling"
published in Cost Engineering, August 2009.
Rectification of CPM Schedules
presented at the AACE 2010 Annual Conference
DCMA 14-Point Assessment Check
, an Industry Peer Review as presented at the first annual Construction CPM Conference, January 2011.
Scheduling for Subcontractors
presented at the 2011 AACE International Annual Conference
MS Project for Construction Scheduling
presented at the 2011 AACE International Annual Conference